Saturday, June 20, 2009

Build Session 23 (240 mins): Shaping the Adapter Plate

I decided to hold off on the dual motor setup for now in hopes of getting this truck up and running this year.

This weekend Jared, Chad, and I marked and cut the 1/2 inch adapter plate that connects the transmission bell housing to the motor adapter.

We used the Rigid band saw with a 3/4 inch Lenox Bi-Metal blade and a LOT of aluminum cutting oil. The cutting was slow going but the end result was worth it. After cutting we cleaned up the edges with the grinder, wire wheel, and a little filing. During the next build session we will drill the holes and bolt the bell housing to the adapter plate.

The adapter plate before we cut...

Clamping the plate down and then tracing the bell housing...
 
 The cutting is slow...Chad keeps the blade plenty lubed with aluminum cutting oil which definitely saved the blade.
  
 We used to brush to keep the oil where we wanted it...
  
 Still cutting hours later...
  
   
Pretty good for a 3/4 inch band saw blade...
  
I'm grinding down the rough cuts... 
  
  
Chad decided to hand file a bit.
  
  
Perfect fit...I like it. Its ready for drilling during the next build session.
 

Friday, June 12, 2009

Build Session 22 (60 mins): Another Coat of POR-15

Jared and I added a coat of POR-15 Chassis Coat black on top of the epoxy paint. The Chassis Coat provides UV protection (fade resistance) on top of the rust preventing epoxy coat.


Friday, June 5, 2009

Build Session 21 (180 mins): Epoxy Painted Battery Racks and Frame

This weekend Jared, Chad, and I had a productive painting session. In a couple of hours we managed to finish the welding on the rear battery racks. Then we painted the rear battery racks, rear differential, and frame with POR-15 Epoxy paint which should keep them from rusting.


Jared and my welding helmets.
Jared and Chad painting. Chad is a good friend of ours. He just graduated from High School, is an invaluable robotics club member on the team that we mentored and is a skilled machinist. Not bad for a teenager!
Starting from the inside and working our way out...
Remember how many months ago we spent a whole day prepping the frame with scrub brushes and the pressure washer...I think it was about a year ago. Wow, time fly's.
I even painted the frame underneath after laying out plastic on the driveway an taping plastic around the cab.
The epoxy paint goes a long ways and looks great.
Nice...
It looks amazing!
Chad got some POR-15 epoxy on himself...It should wear off in a few weeks. Sorry Chad. :)

Wednesday, June 3, 2009

Zilla Z2K Controller Finally Arrived!

Yes, it has been over six months since I have posted! I have been extremely busy with work and mentoring a high school robotics team. School is out and robotics is over for now. Work is still extremely busy but several EV discussions with my good friend Jared has helped motivate me to spend a little bit of time each week on the project...regardless of work deadlines. I hope to continue making progress and posting the results on a more regular basis.

But that's not the purpose of this post. If you haven't already guess from the title of this post...drum roll please...yes, after almost eight months of waiting THE ZILLA HAS ARRIVED!!! It makes me happy. :)

Saturday, November 1, 2008

Battery Box Layout Diagram

I'm still busy with family activities, at work, and with various projects as a mentor of the Tahoma Robotics Club so I currently have very little time to work on this project. However, the good new is that my batteries are on order! Specifically, 50 ThunderSky 160 amp hour batteries. Initially, I plan to use 48 of them at 3.2 volts nominal each for a total of 153.6 total volts. I have been working with Manzanita Micro and they have agreed to order the batteries for me. My original plan was to order the TS batteries direct from China but I dreaded the hassle of getting them through customs.  Manzanita Micro has experience ording these cells as they use them in their prius hybrid kits. So, I sent them a check and now I wait.  The lithium batteries may arrive this year although it won't slow me down any if they don't since my Zilla controller won't be ready until May or June. And so I must be patient...

I created a diagram for those of you who are interested in some of the dimensions and layout of the battery boxes. The 48 ThunderSky cells will completely fill the forward twin battery boxes under the lift bed and a little over half of the rear battery box, leaving me some room for expansion in the future. With 48 of the 160 amp hour cells the total traction pack will contain over 24,000 kwh.  I estimate that this will provide me with a range of 100 plus miles at my average daily driving speeds. But only time will tell...



Notice the red motors in the diagram with not tranmission. I have done a lot of research lately on the possiblity of building a direct drive system. Which basically means connecting the motor or motors directly to the drive line and eliminating the transmission completely. Many people that I have contacted say it can't or shouldn't be done while others seem to disagree. John (coworker and former race car builder/driver) and I have completed many calculations on this subject and have determined that two WarP / Impulse 9 inch motors connect in series will provide ample torque even on hills at slow speeds when controlled by my Zilla and its parallel / series capabilities. So, I am tentatively planning to move forward with this plan and may put an order in for a couple of Impulse 9 motors at the end of this year. I'll keep you posted...

Saturday, October 18, 2008

Build Session 20 (60 mins): Started Prepping Battery Racks for Paint

Finding time to work on my truck lately still seems to be few and far between...
However, I was able to fabricate and weld in a final battery rack support member between the two forward battery racks.
I plan to epoxy coat (paint) the entire frame with POR15 rust protector and chassis coat. I'm currently prepping the frame by removing the rust, dirt, etc...
I'm pretty busy of the next few weeks but I hope to complete the prep work and rack painting by mid November.

Wednesday, October 15, 2008

Ordered a Zilla Z2K Controller Today!

I first discovered the Zilla controller a few years ago when I began my EV conversion research. Ever since then I have been drooling over its rich feature set and performance capabilities.

My decision to upgrade to lithium batteries (LiFePO4) has given me new reasons to pondered the idea of upgrading my 144v Curtis Controller to a Zilla controller because of it capabilities and features. Specifically I want to be able to programatically shut the controller down when any of my Thunder Sky Cells reach their minimum voltage range. This will allow me to protect the cells from under-running damage. In addition, the Zilla will allow me to run higher voltage which means better performance.

Recently I discovered that Otmar who is the founder of Cafe Electric (makers of the Zilla controller) plans to sell the Zilla rights and stop production. So I decided that I'd better buy one before they are completely unavailable and/or even more expensive. The only downside is that it will take 6 to 8 months before my controller will arrive. Once my Zilla arrives I plan to move the Curtis controller to my Porsche 914.

Hmmm.... Now I need a TransWarp 11 motor with direct drive shaft. Then I can eliminate my transmission altogether and really make this truck peppy!